胜利仪表
Language
Solution provider in the field of oil and gas measurement
Current position:
Homepage
>
News center
10-22

Precautions for the use of high-pressure water meters

1.1 Newly put into use pipeline, due to construction reasons, a large amount of stones, mud, sand, hemp wire, welding slag and other impurities may be brought into the pipeline
08-19

Installation requirements for bimetal thermometers and thermocouples

Normally, if the bimetal thermometer or thermocouple is installed in different positions, their installation requirements are also different
08-19

Three troubleshooting methods for pressure transmitters

If the pressure transmitter has some faults during use, it can be solved and eliminated through the following steps
Previous page
1
这是描述信息

Add: Hekou Economic and Technological Development Zone, Dongying City, Shandong Province
Tel:+86-0546-3633078
Mobile Phone:+86-13706470877
Website:www.shengliyibiao.com

Copyright © Shengli Oil Field Shengli Petroleum Instrument Factory   2020 All rights reserved     鲁ICP备20031532号 

Poweredd by  www.300.cn